Aerospace and Defense Supplier FAQ
These are the questions shop owners, quality managers and sales leads ask most when they start chasing aerospace and defense work. Each answer is short and points to a deeper page where one exists.
Who this FAQ is for
This page is for machine shops, fabricators, process houses, electronics and harness shops, composites shops and test labs that want aerospace or defense work and need quick, accurate answers.
Regulatory figures here, such as the ITAR registration fee and CMMC dates, come from the regulations and the agencies that run them, and the sources are listed at the bottom. Rules change, so check the linked source before you rely on a number for a bid or a budget. Nothing here is legal advice. For export control classification in particular, get a qualified opinion.
Where to go deeper
Start with the full supplier guide if you want the whole path in order. If you are ready to work through your own gaps, use the readiness checklist. For buyer approval specifically, read how to get on an approved supplier list, and for the choice between selling direct, using a marketplace or working with a sourcing partner, see sourcing network vs direct.
Ask us about a job
If your question is really "is there work for a shop like mine," the fastest answer is to sign up free at /suppliers/. Tell Aerospace Sourcing what you make, which processes you run and which certifications you hold. We review every signup and reach out when a buyer's request fits your shop.
Questions
What is a cert package?
It is the set of documents that ships with aerospace parts to prove they meet the purchase order. A typical package includes a certificate of conformance, material certifications such as mill certs, certifications from any outside special processors, inspection records and, when the PO calls for it, a first article inspection report. Buyers check the package at receiving inspection, and a missing or mismatched document can hold up acceptance even when the parts are perfect.
What is a certificate of conformance and who signs it?
A certificate of conformance, or C of C, is the supplier's written statement that the parts shipped meet the purchase order and drawing requirements. It usually lists the part number, revision, quantity, PO number and applicable specifications. An authorized person at the supplier, often in quality, signs it. Because it is a formal statement, signing a C of C for parts that do not conform is a serious matter, so treat it as more than a form.
What is the difference between ISO 9001 and AS9100?
AS9100 includes all of ISO 9001 and adds requirements specific to aviation, space and defense, such as configuration management, product safety, counterfeit part prevention, first article inspection and tighter control of external providers. A shop certified to ISO 9001 already has much of the structure. Moving to AS9100 means adding those aerospace requirements and passing an audit by a certification body accredited for the aerospace scheme.
How will a buyer verify my AS9100 certificate?
Most will look you up in the IAQG OASIS database, which lists organizations certified under the IAQG scheme along with certificate scope and status. Certification bodies treat OASIS as the reference, so an organization missing from it may not be treated as certified. Check your own listing once a year to make sure your scope, address and status are correct, because buyers will see exactly what OASIS shows.
What is a CAGE code and how do I get one?
A CAGE code is a five-character identifier for companies doing business with the federal government, used heavily in defense purchasing, and you can look codes up at cage.dla.mil. You do not apply for it on its own. The Defense Logistics Agency assigns it as part of your SAM.gov registration, which also issues your Unique Entity ID. SAM.gov registration is free and must be renewed every 365 days to stay active.
How much does ITAR registration cost?
Under 22 CFR 122.3, new registrants pay a Tier 1 fee of $3,000 per year. Renewing registrants who received five or fewer favorable determinations on license applications in the review period pay $4,000 under Tier 2. Above five, Tier 3 is $4,000 plus $1,100 for each favorable determination over five. See the ITAR registration page for who has to register.
What is CUI and how do I know if I have it?
Controlled Unclassified Information is government information that requires safeguarding but is not classified. In defense subcontracting it often arrives as drawings, specifications or technical data marked as CUI by the government or the prime. If your purchase order includes DFARS 252.204-7012 or the drawings carry CUI markings, assume you are handling CUI and ask your buyer to confirm. CUI brings NIST SP 800-171 and CMMC Level 2 into play.
When will CMMC third-party certification show up in my contracts?
The DFARS rule implementing CMMC took effect on November 10, 2025, starting a four-phase rollout. Phase 1 focuses mainly on self-assessments. Phase 2, which would have added Level 2 third-party certification on November 10, 2026, was suspended on July 13, 2026 pending a task force review, so check the DoD CIO CMMC page for the current status of applicable solicitations and contracts. All applicable contracts are scheduled to include CMMC requirements by November 10, 2028. Your buyer can still flow requirements down earlier.
What is SPRS?
The Supplier Performance Risk System is a Department of Defense system where contractors post cybersecurity assessment results, among other supplier data. Under DFARS 252.204-7019, a contractor handling CUI needs a current NIST SP 800-171 assessment score in SPRS, generally no more than three years old unless the solicitation asks for a more recent one. CMMC self-assessment results and affirmations are also posted there.
Do I need Nadcap to plate, heat treat or inspect aerospace parts?
Often, but not always. Many primes require Nadcap accreditation for special processes such as heat treating, chemical processing and NDT, while others accept their own process approval for some work. Nadcap is administered by the Performance Review Institute and uses one industry-agreed audit reviewed by task groups of primes, government and suppliers. Check each buyer's quality clauses before you assume either way.
What is a flow-down?
A flow-down is a requirement your customer passes to you, and that you in turn must pass to your own suppliers. It can be a quality clause, a cybersecurity clause such as DFARS 252.204-7012, export control restrictions, or customer-specific requirements. AS9100 requires buyers to communicate requirements to external providers and expects them to reach sub-tier suppliers. If you outsource plating, the plater usually inherits the relevant requirements.
Can non-US persons in my shop work on ITAR jobs?
Not without an export authorization. Under 22 CFR 120.50, releasing technical data to a foreign person inside the United States is a deemed export, even inside your own building. Most small shops handle this by limiting ITAR jobs and drawings to US persons and controlling who can see screens, prints and files. If you need non-US employees on controlled work, talk to an export control attorney about licensing before they touch the data.
Why do primes care about small business subcontracting?
Large federal prime contractors on contracts above the FAR threshold must submit small business subcontracting plans with goals for small, veteran-owned, service-disabled veteran-owned, HUBZone, small disadvantaged and women-owned small businesses. The threshold rose from $750,000 to $900,000 on October 1, 2025, and $2 million for construction. Primes report progress against those goals, so a qualified small supplier can help them meet commitments.
How does Aerospace Sourcing protect customer data?
Every supplier signs a flow-down NDA before seeing customer data, and suppliers do not learn the end customer unless that customer approves. ITAR, EAR and CUI data never moves through the website. Controlled data moves only by secure transfer, and only to US persons. That keeps your shop clear of data you should not be receiving and gives buyers confidence in the chain.
Will Aerospace Sourcing guarantee me a number of RFQs?
No. Aerospace Sourcing is a new sourcing service and does not promise any volume of RFQs or guaranteed work. We review every supplier signup and contact the supplier when a buyer's request fits their capabilities. The more accurately you describe your equipment, processes, materials and certifications, the easier it is for us to recognize a fit.
Can I list more than machining capacity?
Yes. At signup you can choose to receive RFQs as a supplier, sell certified surplus material, list spare test lab or cleanroom capacity, win subcontracts from primes as a small business, ask for help getting ready for CMMC, or request early access to quality paperwork software for first article inspection, certificates of conformance and traceability. Signing up is free.
Related
Sources
- IAQG OASIS database
- GSA SAM.gov Quick Start Guide: Registering a New Entity
- 22 CFR 122.3, ITAR registration fees (Cornell LII)
- 22 CFR 120.50, Export (deemed export) definition (Cornell LII)
- DLA CAGE code search
- DoD CIO, About CMMC
- 48 CFR 252.204-7019, NIST SP 800-171 DoD Assessment Requirements (Cornell LII)
- Boeing Suppliers, Nadcap FAQ
- NQA, AS9100D flow down of requirements to external providers
- Federal Register, FAR inflation adjustment of acquisition-related thresholds (2025)